Showing posts with label Shed. Show all posts
Showing posts with label Shed. Show all posts

Sunday, 16 August 2009

The Shed.....AGAIN




This is taking a long, long time! and it honestly feels like it is taking forever. But at this point every little step forward is like a giant leap. Pictured above is what we did this weekend: Firstly has you can see I have turned the car in to moving advertisement, very very cool. I have one on the door of the shed too. The next pic is of the slat wall we have installed under the window....there is a similar piece on the opposite wall. I still need to track down some hardware for that.....will be nice to have things up on display..... and lastly in lining of the front wall. The left side was mostly done last weekend....but the little bits in the middle either side of the door where fussy cuts: they were done yesterday. And today we did the even fiddler ones round the window and that giant angled piece above the window. We just have to cover the steel and do some trims on that wall now......

I am ordering a whole heap of plastic tubs tomorrow. The plan....to sort and label while I cant do anything else. Hopefully it will serve 2 purposes......to keep me busy and make me feel like I am doing something and SHOULD make moving day a whole lot easier. Will take a pic when they arrive......I am a little excited...does that make me strange??

BFN


Tuesday, 11 August 2009

Shed Update


Now I know I promised you a shed update tomorrow and as it is 12:08am, it is now technically the next tomorrow.....I also figure in theory as I have not been to sleep, it must actually still be today or the first tomorrow and it will remain so until I have been to sleep and I wake up tomorrow! By then I would have welched on my promise to update you tomorrow...........(can you tell it is late?? LOL) So if I do it NOW.......all is good?? Yes...you with me??

So shed....more walls clad. 2 sections are completed of a necessary 6, but a lack of materials had bought us to a grinding halt over the weekend. Husband has spent the day with the trailer on......collecting goodies from all over town. I think it is all here now bar the ceiling. The skirting's are also being custom cut and will be ready for collecting later in the week.

The picture I have included is of one of the completed sections. Including design wall......I plan on covering it with something...I am told flannel is the best. Can you see the power points?? LOL there are 10 double sockets in the room!!! Luxury!

I cannot even begin to tell you how excited I am........(feel a bit like screaming inside........) Just taking deep breaths......and practicing my patience. LOL

More soon I hope!

BFN

Tuesday, 7 July 2009

Shed Update.....

Look, look......finally it is looking more like my studio rather than a shed. I know the walls & ceiling are not finished yet....but the pretty floor is down and the shelves are together waiting for their sliding doors to be built over the top. I now have to wait another couple of weeks for some more progress as husband is interstate working for a couple of weeks. This whole process is taking an extraordinarily long time and my patience is being tested to its limits...but I know it will be worth it in the end.



Wednesday, 20 May 2009

More excitement .....


I am very pleased to show you, my flooring and my cable........not much in one sense but tangible evidence of the slow but steady march forward!! I am very excited with the flooring, it is laminate panels which we can easily install ourselves. I have done a little test walk on the small portion Husband has layed just for fun ( as neither of us could wait). It almost has that walking on hard floor sound, which I love!! It helps me to imagine what the room will "feel" like, which if it is to be a space I get creative in.........well you know what I mean it needs to "feel" just right. LOL. Hope to be showing you the some clad walls after the weekend!!!

cheers

Saturday, 9 May 2009

Look.......

.....a wall already, well the framework anyway. I know I promised more regular posts, but didn't think it would be this quick. Husband is very clever!! Yay!!!











Ok......so I am still here!!!

The 28th of March??!!!! I cannot believe I have not posted since the 28th of March!!!!!!! How bad is that??

Well this post will be a quicky, to catch you up on what has happened in the last 6 weeks or so.
  • Ran a Successful craft night at my church, around 40 ladies in attendance....lots of fun, laughter and good food. Oh and craft. LOL Doing another one on June 10th, making a bracelet. Wanna come??
  • Been to Queensland and back......2 weeks away in total, including 8 days on the Gold Coast. Did a few of the parks but loved Seaworld & Currumbin Sanctuary the best. Only visited 1 Patchwork Shop the whole time, in Dubbo!!
  • Had a stall at the Bi annual Heathmont Baptist Quilt Exhibition. Was fun and successful. Met some lovely people, made a little money  but most made some BIG decisions.
  • Have shelved myself as a Black Dog outworker. Not quit, just taking a break. ( Yes that is one of the big decisions)
  • Having ANOTHER stall at the Ringwood Church of Christ Quilt Exhibition (May 28th, 29th & 30th) so am busy preparing for that.
  • Am trying once again to write some patterns..............but procrastinating more than anything.
  • And lastly the shed........!!!! The only thing that has happened on the shed is that we FINALLY got the notification that the building had been inspected and was ready to go. Husband is out hopefully getting materials for building the wall between his bit and my bit, and we hope to start on the wiring this weekend too.
Ok I think that will do for now......pics and more detailed info from now on....promise!

Saturday, 28 March 2009

Here it is..........

............finally in all its glory!! Well the exterior anyways. We are at lock up, and have even had rain to prove that it is also water tight! In fact there is a 3000 liter tank at the back, that is also functioning and is about 1/3 full now!! We are well pleased.

It has been an intense month. Between my obligation to Black Dog, planning a craft night for my Church, and the everyday family stuff.........life has been a bit of a blur. Obviously if we were having it built it would not have taken that long. But when Husband has often been working 6 days a week, we have had to grab what ever spare min there was to build the shed. There has also been rain and heat to deal with, usually on alternating days but sometimes you would get slammed with both. It has been quite amazing watching Husband work on this. Although he doesn't build sheds for a living, he does work with steal and aluminum every day so it was simply a matter of applying that skill to a different project. Thankfully it also meant he had all the right tools to make the job a breeze. I have spent a lot of time at the bottom of his ladder making sure it doesnt tip. But I have also done my fair share of ladder time, far from my favorite thing.

SO.......Term 1 has been about the build, term 2 is all about the fit out and MOVING IN!!! We are on hold for a couple of weeks. Holidays are coming up whoohoo, I think, we have a long drive ahead of us. (More about that in another post)

Sorry I have been away so long, but I think the Big Red Shed is evidence that I haven't been sitting on my behind!! LOL



Sunday, 22 February 2009

At last, some real progress

       Well here it is, almost in all its glory. We have the frame up, the door and most of the windows in. Husband has also finished the line of water proofing around the bottom.  We are having a very quick dinner and then we hope to get at least a couple of panels of cladding on tonight. I stand in it and cant still quite believe it will be mine!! I am now wondering about window coverings, floor coverings, furniture!!! POWER POINTS, where shall I put the power points, I know I want lots!! Hope to have a pic of the finished exterior by next weekend.


Saturday, 7 February 2009

More Concrete & Parcels......

Here finally is a picture of the finished slab. Not very exciting I know but a huge milestone in what is becoming the soap opera of this project. Husband is home, but of course it is going to be 44 degrees here today, so there will be no real work done. He is off buying brackets, as that can be done in an air conditioned car.

Nancy is back from her trip and informed me that her parcel has arrived safely, so that is all 3 received now. Thanks again to everyone who joined in the fun, I am just sorry I couldn't give a prize to everyone.

At the left of the photo you can just see some huge trees. They are part of a protected reserve that surrounds the Blind Creek Billabong which is just behind our house. It was one of the features that attracted us to the area, but of course on a day like today it becomes a point of concern. Over the 10 years we have lived here, we have had several deliberately lit fires in the reserve, one burning a significant area of the bushland. That fire was only about 100m behind our back fence. But I am in the middle of suburbia, and the risk to my property is realatively small. I cannot even imagine what it is like for friends and family who live with an ever present high threat of fire at this time of the year. So to all of you who are literally sweating out the arrival of the cool change, I am thinking of you and praying that this feral day passes without incident.

BFN

Thursday, 5 February 2009

Concrete..& Parcels

I didnt realize it had been so long since I posted. To all those who have enquired, yes the concrete went done as scheduled on Tuesday. I then had to spend the next 2 days watering it so it would not dry too fast in that ridiculas heat we had last week. It felt so wrong, but I had been told water or it will crack. I have no pic at the moment. I did try to post one last week but the google uploader was misbehaving and now I cannot find the picture. Husband who has been in Perth working for 2 weeks, will be home Friday, not sure how long it will be before he starts building.

In regards to parcels, May Britt & Lissa have been in touch to say their packages arrived safely. Has your come yet Nancy?? I cannot understand how you could not if May Britt does?? 

I now better get myself packed up for the class I am teaching tonight, apparently I am getting 4 new students!!! It is exciting and scary all at the same time.

BFN

Sunday, 25 January 2009

Big Red Shed Update...

Well Saturday morning we FINALLY saw some action in the back yard. The boys turned up to box up the slab and put the plastic and reo in place. I am told they will be coming at 7am Tuesday to pour the concrete. I have almost been too scared to say it out loud just in case. Only time will tell, but hopefully by tomorrow night I will be able to share pictures of my floor!

Cheers

Saturday, 27 December 2008

Big Red Shed Update

Well here it is!! Being off loaded. I am not sure if the driver thought it a little strange that I sat and watched this happen oh and took photos of course!
And, apparently THIS relatively small pile of components, is my Big Red Shed??? At present we are still waiting on the concrete. The holes have almost dried out but seem intact. Husband informed me yesterday that he is supposed to be going to Perth in Jan for work! Which of course sent shivers down my spine and prompted me to ask WHEN my shed was going to be built. I am told that all will be ok, but I am a slightly nervous Nellie you can bet. Will hopefully be posting more exciting photos soon!!

Monday, 15 December 2008

It's SHED DAY TOMORROW!

It wont be UP but it will be HERE!!! I hope I dont have to wait ALL day, it will be so frustrating if I do. Thankfully I have some stitching to do to keep my hands busy. (oh and a tonne of housework too!)


Saturday, 13 December 2008

Shed Update......

As lovely as the rain it, it has turned my construction site into a series of swimming pools. We have had nearly 50mm of rain since lunch time yesterday and there is rain forecast for the rest of the week. So there will be no concrete being put in these holes anytime soon. Trying to take deep breaths and keep busy with other stuff so I dont fret too much about the lack of progress.


Friday, 7 November 2008

Shed Update

I guess it is time for an update on the shed. We ordered it on Wednesday!! We were advised that if the order was not placed by last week there would be no chance of getting it prior to christmas, and the delivery date would be Feb! Not having a bar of that!!! So got negotiating with DH quick smart. It is not just that I am desperate, but that both DH and I have the time over the christmas holidays to plaster, paint and get it set up. I have to admit to losing just a little sleep this past week planning it all out, I can see it all soooo clearly. Thankfully there has been distractions ie choosing a new car, and mobile phone. (Yes I picked a red car, what can I say, red makes me happy) 

Will post pictures as there is progress. Darren is planning on starting the ground preparation next week I think!!!